Pages

18 April 2009

Ready for Floors

We got a lot of work done today! I finished grinding down the nails that held in the old sub-floor in the front hall (they were too large and too deep to pull out), then removed the adhesive that was also holding in the old subfloor. I used the floor scraper that I have been using to remove the linoleum from the exercise room.


Scraping the sub-floor clean

Here is a photo of the living room, ready for floors:

The camera caught lots of the dust that was still in the air from grinding down the nails (and a bit of the concrete foundation).

Here is the bedroom hall ready to go. That creamy colour is the fourth one we painted on the hallway walls. The light is weird here, and nothing we put up ended up looking like it did on the little paint swatch.

Isabel is camping out in the master bedroom, which is quieter and more peaceful. Now she has 800ft² of flooring to play on.

And there are plenty of mermaids all over the place for her to play with (this is a screw mermaid).

No comments: