Erik's company is working on a deadline, which means lots of extra hours. Tonight, he did some work from home, Sarah-style.

Working from home
Erik's company is working on a deadline, which means lots of extra hours. Tonight, he did some work from home, Sarah-style.

We sealed the door between the house and the garage! After we replaced the floor in the front hall, there was an almost 2" gap under the garage door, which became an urgent problem when Erik surprised a rat in the garage one night while we were working late. We have learned that "Oh, a rodent used to live here" might actually mean, "A rat is living in the garage right now." Yikes!
So we took the garage door down, pulled off an old extension and added a new longer one, and put a nice big rubber seal on the bottom. We also finished the transition from the new floor to the cement garage floor.

While we were working on the door, I noticed that although it is a heavy, solid wood door, it is deeply scratched -- from the garage side That's upsetting! I hope the former owner's dogs didn't have to spend all day in the garage.
We got a microwave and installed it! We got it a few days ago but it took several evenings of trying before we got it installed. The placement of the holes on the underside of the cupboard was tricky, and the underside of our cupboard had a bunch of features that made measurement difficult.

Since our range's oven is broken, we didn't have a way to heat food during the few days that the microwave was sitting on the cook-top. So now that we have it installed, it's like two appliances for the price of one.
Do you remember that 1980s fix-it show called "Do It for Yourself"? It featured the first female renovation host, Mary Bellows, and her big black dogs, Zeke and Hoover. They never cut away from any part of the repair, so if the repair took ten minutes, the segment took ten minutes, and if Mary made a mistake that caused water to gush all over the set, the segment lasted until the problem was fixed. However, Mary was an actress who was hired for her hosting talent, not her fixing talent: before taping, an expert would teach her how to do the repair, and then she would perform the repair for the cameras. The most annoying part of the show was Zeke, who would appear in most segments, usually at the worst possible point, getting his nose into the repair and blocking the camera with his big hairy butt. Mary would stop what she was doing, reach into her apron pocket, and toss a dog biscuit across the studio, shouting, "Go get the doggie cookie, Zeke! Go get the doggie cookie! Then she would laugh her crazy but lovable laugh and go back to work. I wish that for the first woman DIY host they had chosen someone more competent, rather than pretty but goofy and prone to errors. The message seemed to be, "If this silly girl can do it, so can you!" It wasn't really instructional.

I was thinking about this show today as I tried to remove the remaining bits of caulking from around the tub in the main bathroom, with Isabel climbing into the bathtub pretending to be mermaid Marianna who has lost her crown. I guess I need the three-year-old equivalent of dog biscuits.
Erik proposed that now that we are moved in, we should put baseboards in before moving into any more rooms. So, started yesterday by sanding and then repainting the baseboards we pulled out of the study. Now they are ready to put in:

Here is how the room looks with baseboards in:

Now all I have to do is paint the rest of the trim and put up the furnace vent covers and this room is done!
We had a repairman come today to try to get our stove working. When he pulled the stove all the way out from the counters so he could look at some parts, two sad facts were revealed: First, wow, the stove and the space all around the stove, especially the floor, REALLY NEEDS CLEANING. Second, the stove is hardwired! No plug, just a rough (fist-shaped, you might guess) hole in the wall with the wire coming out and running into the stove. Technically it can be done that way but you wouldn't!
The over-the-stove hood, which we took down in preparation for getting a microwave, was also hardwired. More trips to Home Depot, more things on the list of things to do, haha.

Following the floorplan of the house, we have to do a few rows that run from the back wall, through the living room, down the hall, and into Isabel's room all the way to the front of the house. When these rows are done, the living room will be finished! Also the second hallway, and about a third of Isabel's room. Then we will finish Isabel's room, then our room, then the study.



We move in three days!!!
After spending some time figuring out which wall will determine the floor placement for the whole rest of the house, we started laying floors in the front hall. It took us a really long time to do the first hundred square feet, but we much got faster toward the end of the day. I did the whole front hall closet floor myself:

Here's how the living room looks (almost) completely floored:

Here's Erik taking a break late late late at night:

Isabel has been great about falling asleep on her sleepover bed in the master bedroom and letting us wake her up enough to put her in her carseat, then transfer her into her big bed back at the apartment. This has allowed us to work much later than we would be able to if we had to quit at her bed time.
Look how ready this floor is!

Here is the first strip of underlayment going down:

This is what happens when you leave your materials out on the floor for a little while:

All the underlayment trimmings are mermaids!

Look, the living room is done!

The kitchen is the only non-bathroom room that is not getting a new floor, so all our materials are piled up in there:

When this mess is gone, the floor will be done!
We got a lot of work done today! I finished grinding down the nails that held in the old sub-floor in the front hall (they were too large and too deep to pull out), then removed the adhesive that was also holding in the old subfloor. I used the floor scraper that I have been using to remove the linoleum from the exercise room.

Here is a photo of the living room, ready for floors:

The camera caught lots of the dust that was still in the air from grinding down the nails (and a bit of the concrete foundation).
Here is the bedroom hall ready to go. That creamy colour is the fourth one we painted on the hallway walls. The light is weird here, and nothing we put up ended up looking like it did on the little paint swatch.

Isabel is camping out in the master bedroom, which is quieter and more peaceful. Now she has 800ft² of flooring to play on.

And there are plenty of mermaids all over the place for her to play with (this is a screw mermaid).

Today we rented a 10' truck and went to the house to pick up the carpets and haul them to the dump. The City only picks up large items like this once a year, and our pick-up is still four months away, so we had to take care of it.

After the entrance to the dump, we had to drive another mile over rough rocks to get to the current dumping area. It was a weird, barren landscape, but eventually we rounded a corner and found other trucks with other people dumping. When we opened our truck to haul the carpets out, we realized that the back of the truck had filled with the nasty smell that has been in our house. It was a combination of dog, cigarette smoke, over-scented carpet cleaner, and old -- and we took it with us to the dump! Hopefully, the air in our house will start to clear out and smell better now.

After the dump, we went to the warehouse where we bought our floors and picked those up, then unloaded them into the new house and took the truck back. Lots of hard work, but I'm looking forward to installing floors!
Isabel's room and the office are both painted!
And the living room carpet is rolled up and ready to take to the dump!

We finally have the original oak hardwood floors up in the front hallway, and we have ground off all the nails sticking up out of the concrete slab. We put that job off until the end because of how hard it is to rip up the floor. Today, Erik re-fixed an old drywall repair that had fallen apart, and the walls are cleaned, taped, and ready to go.

