Pages

22 June 2009

Your WHAT Is Broken Now?

Our annual border-crossing paperwork stress is starting early this year! In preparing for our trip up north next month, Erik checked to see if our advance parole documents are still valid, and they have expired. No international travel for us!

This would not be a problem if our permanent resident cards were here, which they absolutely should be by now. We were approved in mid-December and told that it can take up to 90 days for us to receive our cards, so we waited. After allowing an extra 60 days, we phoned and found out that there is a further 8-week delay due to, wait for it, the card printing press is offline. Come on, America!

We have an appointment to get temporary evidence of permanent residence stamped into our passports at the USCIS office in San Antonio. If that works, we get to go to Canada next month. I can't believe I am already freaked out about paperwork when the trip is still a month away!

21 June 2009

The Fountain Works!

We plugged in the fountain beside our back porch and added some water, and look, it works!

It needs a little repair to the concrete, but I love it.

20 June 2009

House Circuits Are Fixed

Erik spent the last two days trying to figure out why some outlets and lights on the living room / dining room circuit didn't work after he rewired one that did work. It turns out, I had done a terrible job on the ONE outlet I rewired, and when he rewired a different one, mine stopped working.


The back porch light comes on now!

In my defense, 16-gauge wire is difficult to bend around the little screws. I worry that I am excused from future house wiring.

11 June 2009

New Roof

We were scheduled to receive our roof tomorrow, but the work crew actually got here at about 10:30 this morning and they were finished by 6:30 this evening, rolling out their trucks just before Erik got home.


Our new roof

This is the only picture I have of it so far because two hours later, hail was falling on it! Unbelievable. But we were lucky: not only did the hail top out at about 3/4" (not big enough to damage a roof), but the tree that fell down across the road fell at an angle and missed our car, which I had forgotten to bring into the garage when the roofers left, by about two feet. Lucky, lucky, lucky!

08 June 2009

Skytubes Are in!

Our house is going to get a new roof this week, so we needed to get our skylights in. If we waited, we would have had to drill holes in the brand new roof, which is risky and would probably end our warranty. So this weekend we got to work on the roof!

Here is how the living room looked before we got started:


Living room before shot

The first step was to figure out where the tubes would go, then measure their exact placement, drill holes, and mark those holes in the attic by sending in wires to stick up out of the insulation.


Erik measuring for lights

Here is the attic before any work is done, with the wires sticking up out of the insulation:


Attic with wire markers

Then we went up in the attic and found the spot directly above the ceiling spot, and marked it by nailing a long nail up through the roof. Then, up on the baking roof (actually too hot to put your hand down on it) to find the nails:


Me tracing a roof hole

Then I drilled a pilot hole. This was unnerving -- there's a hole in our roof! I was happier to be doing this to a 17-year-old hail-damaged roof and not to a brand new roof. Next, I cut out the hole with our jigsaw. A big chunk of our roof fell in and landed softly on the insulation below.


Roof hole"

Installing the flashing was trickier than I expected. The shingles snapped apart (or broke) with our pry bar, but in order to access the corners of the flashing so I could screw it down, I had to disrupt a large area of shingles.


Erik installing flashing

Here it is in place. The bucket is for holding all the tools so we don't have to go up and down the ladder too often. It's about 1:30 on Sunday afternoon and the temperature is on its way up to 36º (96ºF), so we're taking plenty of water breaks.


The flashing is in place

Erik working on the roof

And here is the roof with the dome installed!


First dome in the roof

Then back into the attic to cut the corresponding hole out of the living room ceiling:


Me cutting ceiling hole

And it's out! I worried Isabel would be upset by this, but she thought it was great and asked us to cut more holes.


Living room hole

And here how the finished sky tube looks in the living room:


The first light is in!

Then we repeated the whole process with the second tube, finishing it off when Erik got home after work tonight. Here he is placing the light tubes in the hole:


Erik installing the second tube

Unfortunately, we finished too late to see the light coming into the living room, but I'm looking forward to waking up in a bright house tomorrow morning. We didn't seal the flashings down because we didn't want to make it harder for the roofers to get them off and reinstall them. So now we are hoping it doesn't rain much before Friday!

18 May 2009

Erik Works from Home

Erik's company is working on a deadline, which means lots of extra hours. Tonight, he did some work from home, Sarah-style.


Working from home

16 May 2009

Rat-proof Garage Door

We sealed the door between the house and the garage! After we replaced the floor in the front hall, there was an almost 2" gap under the garage door, which became an urgent problem when Erik surprised a rat in the garage one night while we were working late. We have learned that "Oh, a rodent used to live here" might actually mean, "A rat is living in the garage right now." Yikes!

So we took the garage door down, pulled off an old extension and added a new longer one, and put a nice big rubber seal on the bottom. We also finished the transition from the new floor to the cement garage floor.

While we were working on the door, I noticed that although it is a heavy, solid wood door, it is deeply scratched -- from the garage side That's upsetting! I hope the former owner's dogs didn't have to spend all day in the garage.

07 May 2009

Now A Microwave!

We got a microwave and installed it! We got it a few days ago but it took several evenings of trying before we got it installed. The placement of the holes on the underside of the cupboard was tricky, and the underside of our cupboard had a bunch of features that made measurement difficult.


Microwave, installed

Since our range's oven is broken, we didn't have a way to heat food during the few days that the microwave was sitting on the cook-top. So now that we have it installed, it's like two appliances for the price of one.

06 May 2009

Home Repair with A 3-Year-Old

Do you remember that 1980s fix-it show called "Do It for Yourself"? It featured the first female renovation host, Mary Bellows, and her big black dogs, Zeke and Hoover. They never cut away from any part of the repair, so if the repair took ten minutes, the segment took ten minutes, and if Mary made a mistake that caused water to gush all over the set, the segment lasted until the problem was fixed. However, Mary was an actress who was hired for her hosting talent, not her fixing talent: before taping, an expert would teach her how to do the repair, and then she would perform the repair for the cameras. The most annoying part of the show was Zeke, who would appear in most segments, usually at the worst possible point, getting his nose into the repair and blocking the camera with his big hairy butt. Mary would stop what she was doing, reach into her apron pocket, and toss a dog biscuit across the studio, shouting, "Go get the doggie cookie, Zeke! Go get the doggie cookie! Then she would laugh her crazy but lovable laugh and go back to work. I wish that for the first woman DIY host they had chosen someone more competent, rather than pretty but goofy and prone to errors. The message seemed to be, "If this silly girl can do it, so can you!" It wasn't really instructional.


Me on the left, Isabel on the right

I was thinking about this show today as I tried to remove the remaining bits of caulking from around the tub in the main bathroom, with Isabel climbing into the bathtub pretending to be mermaid Marianna who has lost her crown. I guess I need the three-year-old equivalent of dog biscuits.

03 May 2009

Baseboards

Erik proposed that now that we are moved in, we should put baseboards in before moving into any more rooms. So, started yesterday by sanding and then repainting the baseboards we pulled out of the study. Now they are ready to put in:


Erik nailing in baseboards

Here is how the room looks with baseboards in:


Baseboards are in!

Now all I have to do is paint the rest of the trim and put up the furnace vent covers and this room is done!

30 April 2009

Wiring Fail

We had a repairman come today to try to get our stove working. When he pulled the stove all the way out from the counters so he could look at some parts, two sad facts were revealed: First, wow, the stove and the space all around the stove, especially the floor, REALLY NEEDS CLEANING. Second, the stove is hardwired! No plug, just a rough (fist-shaped, you might guess) hole in the wall with the wire coming out and running into the stove. Technically it can be done that way but you wouldn't!

The over-the-stove hood, which we took down in preparation for getting a microwave, was also hardwired. More trips to Home Depot, more things on the list of things to do, haha.


Erik is storing the joist box in the hole so he doesn't lose it. Smart!

23 April 2009

More Floors

Following the floorplan of the house, we have to do a few rows that run from the back wall, through the living room, down the hall, and into Isabel's room all the way to the front of the house. When these rows are done, the living room will be finished! Also the second hallway, and about a third of Isabel's room. Then we will finish Isabel's room, then our room, then the study.


The flooring heads down the hall


Erik puts flooring down in Isabel's room


Hi Erik!

We move in three days!!!

21 April 2009

Floors!

After spending some time figuring out which wall will determine the floor placement for the whole rest of the house, we started laying floors in the front hall. It took us a really long time to do the first hundred square feet, but we much got faster toward the end of the day. I did the whole front hall closet floor myself:


Me laying floor in the front hall closet

Here's how the living room looks (almost) completely floored:


Living room floor

Here's Erik taking a break late late late at night:


Erik is almost done for the night

Isabel has been great about falling asleep on her sleepover bed in the master bedroom and letting us wake her up enough to put her in her carseat, then transfer her into her big bed back at the apartment. This has allowed us to work much later than we would be able to if we had to quit at her bed time.

19 April 2009

Underlayment

Look how ready this floor is!


Erik finalizing the front hall for the new floor

Here is the first strip of underlayment going down:


Underlayment has begun!

This is what happens when you leave your materials out on the floor for a little while:


Isabel under an underlayment blanket

All the underlayment trimmings are mermaids!


Me, working in the living room

Look, the living room is done!


Me and Isabel working on the detail work around the fireplace

The kitchen is the only non-bathroom room that is not getting a new floor, so all our materials are piled up in there:


Materials in the dining room

When this mess is gone, the floor will be done!

18 April 2009

Ready for Floors

We got a lot of work done today! I finished grinding down the nails that held in the old sub-floor in the front hall (they were too large and too deep to pull out), then removed the adhesive that was also holding in the old subfloor. I used the floor scraper that I have been using to remove the linoleum from the exercise room.


Scraping the sub-floor clean

Here is a photo of the living room, ready for floors:

The camera caught lots of the dust that was still in the air from grinding down the nails (and a bit of the concrete foundation).

Here is the bedroom hall ready to go. That creamy colour is the fourth one we painted on the hallway walls. The light is weird here, and nothing we put up ended up looking like it did on the little paint swatch.

Isabel is camping out in the master bedroom, which is quieter and more peaceful. Now she has 800ft² of flooring to play on.

And there are plenty of mermaids all over the place for her to play with (this is a screw mermaid).